Coordination & Communication Enablement

WHY

slide5“Review your goals twice every day  in order to be focused on achieving them.”
– Les Brown, Author, Speaker, Entrepreneur. –

 

 

Nothing will cause management to fail faster than a lack of consistency.

slide5

 

 

a

Effective Decision Making = ƒ(Q,A)

where:

Q  = Quality of the decision;

A  = Acceptance by the executors.

 

“What is the Key to SYNERGY?”

  • Coordination;
  • Think-Ship;
  • PDSA Mindset!

WHAT & HOW

  1. Know the Types of Meeting: Working, Review, and Ceremonial;

slide6

2. Appoint PDSA (Plan, Do, Study, Adjust) Facilitators to ensure process consistency & continuity throughout PDSA cycle;

slide7

3. Design & develop the right PDSA Tools & Templates:

aa– Meeting Structure;
aa– Calendar of Events;
aa– Minutes of Meetings;
aa– Periodic Progress Reports;
aa– Document Mgt. System.

slide3

 

 

 

 

 

 

 

 

 

History of PDSA:

1620: Scientific Method  

Performing Cycle by  Sir Francis Bacon, Philosopher, Author: “Novum Organum.”

 

1939: Shewart Cycle
Work Performing Cycle by  Walter Andrew Shewart, Physicist, Engineer, Father of Statistical Quality Control.

 

1951: Plan-Do-Check-Act 

Work Performing Cycle by M. Edwards Deming. Statistician, Professor, Author, Consultant.

 

2011: Plan-Do-Study-Adjust
Work Performing Cycle.